Production moulds cleaned in-situ during scheduled maintenance, removing release agent build-up without dismantling or chemical baths.
A plastics manufacturer in East Anglia was experiencing quality issues caused by release agent build-up in production moulds. Traditional cleaning required removing moulds from the press, transporting to a cleaning facility and using chemical baths — a process taking 2–3 days per mould and causing significant production downtime.
We cleaned the moulds in-situ during a scheduled maintenance window, using our laser system to remove release agent build-up from all mould surfaces without dismantling. The process took hours rather than days and left no chemical residue.
All moulds cleaned in-situ during a single maintenance shift. Production quality issues resolved. Client estimated saving of 3 days production downtime per mould cleaning cycle. No chemical waste generated.
Contact us today for a free, no-obligation quotation. We cover all of Essex and East Anglia.
Get a free, no-obligation quotation. We cover all of Essex and East Anglia.